Excavation for bottom course is cut Into a bottom prepared by the grading contractor and accepted by the geotechnical engineer.
Survey stakes for the wall location and heights (TW and BW per structural plan) are set by the civil engineer.
An aggregate base leveling pad can be constructed at this stage if necessary. In most cases leveling pads are not required for Verdura® walls.